Project Details
Client: | City of Ottawa |
---|---|
Location: | Colonel By Drive |
Timeframe: | August 2017- July 2019 |
Partners: |
|
Tomlinson Divisions: |
|
Requirements
- Working within a UNESCO National Heritage Site
Project Description
- This project involved the replacement of 262m of canal walls along Echo Drive, including reconstruction of the canal wall and the multi-use pathway.
- Tomlinson crews installed H-pile and lagging shoring along the entire length of the project to protect and maintain the boulevard and Colonel By Drive
- Tomlinson completed in-water work and dewatering of the worksite with sump pumps, at one point running five 6 inch, and one 8 inch, pumps
- Installation of sheet-pile cofferdam system to keep worksite in-the-dry
- Placement of mass concrete pad for new retaining wall
- Ice removal from the Rideau Canal
- Installation of retaining wall on spread footing and retaining walls on piles
- Excavation and backfill
- Traffic Management and Pedestrian Control
- Removal and reinstallation of salvaged posts and railing