Project Details
| Location: | Queen Street | 
|---|---|
| Timeframe: | 2016-2019 | 
| Value: | $9,000,000 | 
| Tomlinson Divisions: | Tomlinson Sewer and Watermain | 
Requirements
- Coordination with Light Rail Transit downtown tunnel
 - Maintaining one all-purpose travel lane in each direction
 - Auxiliary turn lanes at critical turning locations
 - Flex-space along the street edge for on-street parking and loading.
 - Wider sidewalks to accommodate increased pedestrian volumes
 - Improved landscaping and street furnishings (trees, benches, bike rings, waste receptacles, surface pavers, etc.)
 - New OC Transpo bus stops and shelters
 - Transform Queen Street into a transit showcase street, given that two of the three downtown Confederation Line stations (Lyon Station and Parliament Station) will have station entrances on Queen Street;
 - Support the success of Confederation Line’s Lyon and Parliament Stations;
 - Be the focus of pedestrian activity in the area;
 - Support bus-to-LRT interface zones to serve the Confederation Line in the downtown core;
 - Provide opportunities for on-street parking, loading and service space for commercial vehicles.
 
Project Description
- Construct extra-wide boulevard sidewalks, creative designs for parking and access, priority crosswalks and landscaping.
 - New sanitary and storm sewer and service replacement from Bay Street to Lyon Street.
 - Grading and drainage.
 - New catch basins and catch basin leads.
 - Concrete and unit paver sidewalks, flexible parking and crosswalks.
 - Shared bike lanes.
 - Street furniture and plantings.
 - Resurfacing and sidewalk/curb reinstatement on the western and eastern limits.
 



