Skip to main content
/

Waste Processing & Resource Recovery Facilities

Tomlinson’s waste processing facilities provide the infrastructure our customers need to manage waste efficiently, reduce landfill dependence, and support responsible material recovery across Eastern Ontario. Working alongside our collection services, this network of facilities is designed to efficiently sort, process, and redirect a wide range of waste streams.

From construction and demolition materials to industrial waste, organics, and recyclable fiber, we help customers and the community move materials out of the waste stream and back into productive use.

Our Facilities

Strategically located across Eastern Ontario, our facilities support efficient waste processing, recovery, and transfer.

Waste Recovery Centre

The Waste Recovery Centre is purpose-built to process high volumes of mixed construction, renovation, and demolition materials using advanced sorting systems that maximize recovery.

With capacity of up to 550 tonnes per day and recovering over 80% of landfill bound materials, the facility plays a critical role in helping our customers reduce their environmental impact and meet sustainability standards.

Materials Recovery Facility (MRF)

Our Materials Recovery Facility is designed to process cardboard, mixed fiber, and paper for customers. Advanced baling and material handling systems improve throughput, increase consistency, and prepare recyclables for downstream markets.

Equipped with three full-service dock doors, the facility is built to minimize turnaround times, helping customers move through the site safely and efficiently.

Tomlinson Organics – Joyceville

Tomlinson Organics processes green waste, including food scraps, food-soiled paper, and plant material through dedicated systems designed to divert organic materials from landfill.

Through controlled processing, materials are converted into high-grade topsoil and compost used by contractors, engineers, and landscapers to improve soil quality and support erosion control.

Tomlinson Bantree Reclamation Facility

The Bantree Reclamation Facility specializes in processing hydro-vac and slurry waste using advanced reclamation technology.

Designed for liquid waste streams, the facility separates and recovers reusable materials, reducing landfill disposal and providing contractors and industrial operators with an efficient, reliable solution for managing slurry and hydro-vac waste.

Industrial Waste Facilities

Our Industrial Waste Facilities in Ottawa and Kingston manage a wide range of hazardous and regulated waste streams through controlled processing, consolidation, and transfer operations.

Designed to support safe handling and regulatory compliance, these facilities help customers manage waste efficiently while ensuring materials are directed to the appropriate downstream processing or disposal solution.