Rideau Canal Echo Drive Wall Reconstruction
Rideau
Canal
Echo
Drive
Wall
Reconstruction
Project Description
- This project involved the replacement of 262m of canal walls along Echo Drive, including reconstruction of the canal wall and the multi-use pathway.
- Tomlinson crews installed H-pile and lagging shoring along the entire length of the project to protect and maintain the boulevard and Colonel By Drive
- Tomlinson completed in-water work and dewatering of the worksite with sump pumps, at one point running five 6 inch, and one 8 inch, pumps
- Installation of sheet-pile cofferdam system to keep worksite in-the-dry
- Placement of mass concrete pad for new retaining wall
- Ice removal from the Rideau Canal
- Installation of retaining wall on spread footing and retaining walls on piles
- Excavation and backfill
- Traffic Management and Pedestrian Control
- Removal and reinstallation of salvaged posts and railing
Requirements
- Working within a UNESCO National Heritage Site

Get in Touch
Tomlinson Group Head Office
100 Citigate Drive, Ottawa, ON K2J 6K7
Media Inquiries
Rob Pierce, Senior VP, Planning & Development
rpierce@tomlinsongroup.com24-Hour Emergency Spill Services
Tell Us About Your Project
Tell
Us
About
Your
Project

Work With Us
Reach Out Today
From complex civil projects to everyday material needs, Tomlinson delivers. Get in touch today and start working with Eastern Canada's trusted partner for environmental, infrastructure, and construction solutions.