- Rehabilitate 8th line Overpass – Piperville (175 m) and 7th Line Overpass- Leitrim (235 m)
- Protection System
- Jacking of superstructure
- Concrete overlay
- Remove existing culvert at Shaw’s Creek and install twin box culvert 3000mm x 2400mm Precast Concrete box culvert (208m)
- Construction of two new Bridges (120 m & 160 m) at Bear Brook and highway realignment:
- Cofferdams
- H-Piles
- Rock Points
- Structural Steel Girders
- Demolition of two existing bridges at Bear Brook
- 50km Pavement rehabilitation: 330,000 m2 of cold in-place (CIREAM) and 170,000 tonnes of asphalt
- Rigid Expanded Polystyrene Embankment fill
Services Provided
Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural


Get in Touch
Tomlinson Group Head Office
100 Citigate Drive, Ottawa, ON K2J 6K7
Media Inquiries
Rob Pierce, Senior VP, Planning & Development
rpierce@tomlinsongroup.com24-Hour Emergency Spill Services
Tell Us About Your Project
Tell
Us
About
Your
Project

Work With Us
Reach Out Today
For Complex civil projects to everyday material needs, Tomlinson delivers. Get in touch today and start working with Eastern Canada’s trusted partner for environmental, infrastructure, and construction solutions.